Bridging Mechanical Software and BIM: A Pumped-Storage Hydroelectric Plant in Morocco

This abstract has open access
Abstract Summary

This class is about showing how it is possible to work with mechanical softwares, which at the first impression seem incompatible with Revit or other to do correct 3D coordination, and to produce effectively 2D plans without geometry limitation. It will be based on the case-study of a construction project of a hydroelectric pumping station located in Morroco with a contract of 284 millions euros. The content of this class will demonstrate and share the practical solution that could be applied in any industrial construction projects.

Abstract ID :
AULON598
Submission Type
Industry Talk
Abstract Topic
Model Coordination